Contact Us

Blower Fan some failures Measures

Date: 2016-6-2   Click: 1524 Times

After "Blower Fan" started to slow expansion of production need to adjust the pressure according to the opening degree with diffuser "on" button and the "Close" key control to ensure the necessary air flow. Fan operation, the fan must be constantly monitored, pay attention to the fan current, temperature, oil pressure vacuum inlet of the sound, fan, temperature, vibration and so on. Time and make a record and, if abnormal, to promptly identify the reasons given to exclude and report production department, emergency stop can take action when necessary (use caution). Due to the production or maintenance, repair needs, stop the operation of a wind turbine. 1, to reduce the degree of opening of the diffuser to a minimum (minimum instruction diffuser green light). 2, with a finger touching the fan "Stop" button, the program began to shut down.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

网站地图91抖音下载导航 91抖音成人短视频 91抖音APP下载 快猫成人网站 91香蕉视频下载网址 麻豆一区二区三区精品视频 91香蕉视频IOS下载APP下载 绿巨人免费观看在线直播 91香蕉视频IOS下载安装 91香蕉视频下载污